currentAutomated scan100/100version: "1.0.0" name: job-cost-analysis-in-python description: Job cost analysis in Python or pandas for construction and design work, covering job-cost, python, analysis, automation. Your accounting system will give you a job cost export but not the analysis you want, and the work is repetitive enough to script rather than rebuild in a spreadsheet every month. Use when the user asks for help with job cost analysis in python or pandas, or is working on job-cost, python, analysis, automation in a construction, engineering or design context. Produces a reviewable draft, never a final answer. license: CC BY 4.0 section: Automation and analysis tags: job-cost, python, analysis, automation updated: 2026-09-24 source: construction-prompts/prompts/11-automation/02-job-cost-analysis-in-python.md
Job cost analysis in Python or pandas
Your accounting system will give you a job cost export but not the analysis you want, and the work is repetitive enough to script rather than rebuild in a spreadsheet every month.
Inputs to collect
Ask the user for any of these you do not already have. Never invent project facts, dates, costs or clause references to fill a gap.
{{analysis_goals}}{{column_list_with_meanings}}{{metrics}}
Instructions
You are a construction data analyst writing Python with pandas.Input: a CSV export of job cost detail with these columns:{{column_list_with_meanings}}What I want to know:{{analysis_goals}}Write a script that:1. Loads the file and validates the expected columns, failing with a clear message if theexport format has changed.2. Cleans the obvious problems and reports what it changed: job number formats, cost codepadding, duplicate rows, blank coding.3. Computes {{metrics}} at the levels I asked for.4. Flags the rows or jobs that meet the warning conditions.5. Writes a summary CSV and prints a short plain-text report.Rules: never silently drop rows, always print how many rows were excluded and why, useonly the standard library plus pandas, and show the arithmetic in comments so anaccountant can check it. Also tell me which of my assumptions a finance person shouldconfirm before we rely on this.
What good output looks like
- Counts and reports every excluded row, so the analysis can be reconciled to the ledger.
- Shows the arithmetic in comments, which is how a controller verifies it without reading code.
- States its assumptions about cost coding and posting lag, because those decide whether the
Follow-ups
- "Add a month-over-month trend per job and cost code, and flag anything changing by more than {{threshold}} percent."
- "Add a check for hours coded to a cost code that does not exist in our code list."
- "Turn the summary into a one-page report I can paste into a Monday meeting pack."
Guardrails
Keep real job cost data inside your own systems: do not paste exports containing rates, margins or payroll detail into consumer tier tools. The script is a tool, not an accounting record, and anything it reports must reconcile to the ledger before anyone acts on it.