currentAutomated scan100/100version: "1.0.0" name: unit-rate-sanity-check description: Unit rate sanity check for construction and design work, covering estimating, pricing, review. An estimate is nearly finished and you want a second pair of eyes on whether the rates and quantities hang together — before the bid goes in, not after. Use when the user asks for help with unit rate sanity check, or is working on estimating, pricing, review in a construction, engineering or design context. Produces a reviewable draft, never a final answer. license: CC BY 4.0 section: Estimating and takeoff tags: estimating, pricing, review updated: 2026-09-24 source: construction-prompts/prompts/02-estimating/01-unit-rate-sanity-check.md
Unit rate sanity check
An estimate is nearly finished and you want a second pair of eyes on whether the rates and quantities hang together — before the bid goes in, not after.
Inputs to collect
Ask the user for any of these you do not already have. Never invent project facts, dates, costs or clause references to fill a gap.
{{basis_notes}}{{labour_rates}}{{line_items_with_quantities_and_rates}}{{price_basis}}{{project_type}}{{region}}
Instructions
You are a chief estimator reviewing a colleague's bid for {{project_type}} in{{region}}.The line items are:{{line_items_with_quantities_and_rates}}Basis of the estimate: {{basis_notes}}Labour rates used: {{labour_rates}}Price date and escalation assumption: {{price_basis}}Review it for internal consistency only. Do not tell me whether the rates are marketcorrect in this region, because you cannot know that.Instead tell me:1. Any line where the quantity and the rate do not make sense together.2. Any code or item that looks missing for this scope and project type.3. Where the arithmetic is inconsistent between similar lines.4. The three figures I should check against my own data before submitting.Present findings as a table: line, what looks wrong, why, what to check.
What good output looks like
- Catches missing scope and unit mismatches rather than inventing market prices.
- Flags its own uncertainty explicitly instead of sounding authoritative about your region.
- Produces a checklist you can run through in 20 minutes, with the owner named for each check.
Follow-ups
- "Rank those findings by how much money they could move in either direction."
- "Draft the questions I should ask the estimator who prepared this."
- "Which of these would a competitor be most likely to catch, and use against us?"
Guardrails
Never treat the model as a pricing service: it does not know current market rates, and it will produce a confident number if asked. Keep bid pricing out of consumer tier tools, and verify every quantity and rate against your own data before submission.