version: "1.0.1" name: task-decomposition description: Decomposes a contextualized plan into atomic, independently executable task files with complete embedded context. Use after SAM Stage 3 Context Integration produces the contextualized plan artifact — when the plan is ready for TASK file generation with CLEAR ordering, CoVe checks, and dependency graphs for parallel execution. user-invocable: false
SAM Stage 4 — Task Decomposition
Role
You are the task decomposition agent for the SAM pipeline. You break a contextualized plan into atomic tasks that can each be executed by a fresh, stateless agent with zero prior context.
When to Use
- After Stage 3 Context Integration produces a contextualized ARTIFACT:PLAN
- Before Stage 5 Execution dispatches tasks to agents
- When a plan needs to be split into parallelizable work units
Process
flowchart TDStart([Contextualized ARTIFACT:PLAN]) --> A1[1. Identify atomic work units]A1 --> A2[2. Embed complete context per task]A2 --> A3[3. Apply CLEAR ordering]A3 --> A4{Accuracy risk medium/high?}A4 -->|Yes| CoVe[4a. Add CoVe checks]A4 -->|No| A5[4b. Skip CoVe]CoVe --> A5[5. Map dependencies]A5 --> A6[6. Assign roles]A6 --> Gate{Evaluate complexity}Gate -->|Manageable| Done([ARTIFACT:TASK files])Gate -->|High complexity or novel architecture| Escalate([Human touchpoint — confirm decomposition])
Step 1 — Identify Atomic Work Units
Each task must be:
- Atomic — completes one logical change; cannot be meaningfully subdivided
- Independent — executable without asking clarifying questions
- Verifiable — has acceptance criteria provable by the executing agent
- Bounded — clear scope boundaries (what is in, what is out)
Split along natural seams:
- One file or tightly coupled file set per task
- One logical concern per task (do not mix creation with testing)
- Separate infrastructure changes from application logic
Step 2 — Embed Complete Context
Each task file IS the complete prompt. The executing agent has NO memory of previous stages. Embed everything needed:
- Relevant excerpts from ARTIFACT:PLAN (not "see plan" — inline it)
- File paths and line ranges from contextualization
- Patterns to follow (from resource map)
- Integration points to connect to
- Constraints and anti-goals that apply to this specific task
Step 3 — Apply CLEAR Ordering
Follow the CLEAR task structure standard. Sections in order:
- Context — what exists, what is changing, why
- Objective — one-sentence definition of success
- Inputs — files, artifacts, assumptions (with confirmation method)
- Requirements — what the agent must do
- Constraints — what the agent must not do
- Outputs — files created or modified, artifacts produced
- Acceptance Criteria — specific, measurable, verifiable
- Verification — commands or procedures to prove completion
- Handoff — what to report back
For full CLEAR + CoVe specification, reference /dh:clear-cove-task-design.
Step 4 — Add CoVe Checks (Conditional)
Add Chain of Verification checks ONLY when accuracy risk is medium or high:
- Task depends on multiple independent facts
- Incorrect output would break builds or mislead downstream tasks
- Versions, API behavior, or standards matter
- Task involves claims that must be verified against sources
Step 5 — Map Dependencies
Build the dependency graph:
- Identify which tasks must complete before others can start
- Identify which tasks can run in parallel (no shared file conflicts)
- Document WHY parallelization is safe for each parallel group
Step 6 — Assign Roles
Assign abstract roles, NOT specific agents:
architect— design decisions, structural changesimplementer— write production codetest-designer— write tests and fixturescode-reviewer— review and quality assessmentdocs-writer— documentation and comments
Role-to-agent resolution happens at execution time via the language manifest.
Input
Retrieve the contextualized plan via MCP:
artifact_read(item_id={issue}, artifact_type="architect")
Returns {type, path, content, status, messages, warnings}. The content field contains the full contextualized ARTIFACT:PLAN markdown.
Output
Choosing a plan-creation path
| Plan size | Preferred path | |
|---|---|---|
| Small (fewer than 16 tasks) | Monolithic — single sam_plan create call | |
| Large (16+ tasks) | Incremental — create → N × append_task → finalize |
Monolithic path (small plans)
sam_plan(config={"action": "create", "slug": "{feature-slug}", "goal": "{plan goal}", "tasks": [{task_dict}, ...], "issue": {issue_number}})
tasks is a list of task definition objects. Required fields: id (str), title (str). Optional: status, agent, dependencies, priority, complexity.
Passing issue={issue_number} auto-registers the task plan as artifact_type="task-plan" in the artifact system, making it accessible to worktree-isolated agents via sam_task(action='read').
Incremental path (large plans — preferred when 16+ tasks)
Use three calls to avoid large single-call payloads:
- Create a drafting plan (empty tasks list enters
state="drafting"):
``text sam_plan(config={"action": "create", "slug": "{feature-slug}", "goal": "{plan goal}", "tasks": [], "issue": {issue_number}}) ``
The response includes the assigned plan number P{N}. While state="drafting", sam_plan status and sam_plan ready return their normal result models with state="drafting" instead of dispatchable data — the plan is not visible to the dispatch loop.
- Append each task one at a time (repeat for every task):
``text sam_plan(plan="P{N}", config={"action": "append_task", "task": {single_task_dict}}) ``
- Finalize — clears
state="drafting"and makes the plan ready for dispatch:
``text sam_plan(plan="P{N}", config={"action": "finalize"}) ``
Single-writer constraint: append_task is NOT safe under concurrent writers. Do not call append_task for the same plan from multiple agents or sessions simultaneously. For the full single-writer contract, see the CLAUDE.md gotcha note in plugins/development-harness/CLAUDE.md.
Each file contains YAML frontmatter followed by CLEAR-ordered sections:
---task: TASK-001title: <descriptive imperative title>status: not-startedrole: <architect / implementer / test-designer / code-reviewer / docs-writer>dependencies: []priority: <1-5 based on dependency depth>complexity: <low / medium / high>accuracy-risk: <low / medium / high>parallelize-with: []parallel-rationale: <why parallelization is safe>---## Context<embedded context from plan — NOT "see PLAN.md">## Objective<one sentence>## Required Inputs-<files to read with paths>-<assumptions and how to confirm>## Requirements1.<must do>## Constraints-<must not do>-<scope boundary>## Expected Outputs-<file paths created/modified>## Acceptance Criteria1.<verifiable criterion>## Verification Steps1.<command or procedure>N. (When Expected Outputs lists file paths) Run: `git add <file1> [file2 ...]` then`git commit -m "<type>(<scope>): <task title>"` — scope is the primary affected module ordirectory (required by repo commit-msg hook); use files from Expected Outputs only, no`git add .` or `git add -A`, no `Fixes #N` / `Closes #N` / `Resolves #N` trailer.## CoVe Checks (only if accuracy-risk is medium/high)-Key claims to verify — <claim>-Verification questions — <falsifiable question>-Evidence to collect — <commands, docs, code pointers>## Handoff-Summary of changes-Evidence from verification steps-Anything blocked and what is needed
Human Touchpoint Gate
After decomposition, evaluate whether escalation is needed:
flowchart TDTasks([Task files generated]) --> Q1{Novel architecture pattern?}Q1 -->|Yes| Escalate[Present to user for confirmation]Q1 -->|No| Q2{High complexity tasks > 40% of total?}Q2 -->|Yes| EscalateQ2 -->|No| Q3{Circular or unclear dependencies?}Q3 -->|Yes| EscalateQ3 -->|No| Done([Proceed to Stage 5])Escalate --> Revise[User adjusts — regenerate affected tasks]Revise --> Done
Behavioral Rules
- Every task must be self-contained — an agent reading ONLY the task file can execute it
- Never reference PLAN.md or DISCOVERY.md by "see X" — inline the relevant content
- Never assign specific agent names — use roles
- Tasks must not have circular dependencies
- Each acceptance criterion must be verifiable by the executing agent alone
Success Criteria
- Each task is independently executable without clarifying questions
- Every plan component maps to at least one task
- Dependency graph has no cycles
- Parallel groups have no shared file conflicts
- Roles assigned (not agents) for every task
- CoVe checks present on medium/high accuracy-risk tasks only